Make the site safe
Confirm whether the loss is local or wider. Stop hazardous processes safely, protect people in dark or unsafe areas, and avoid repeated power cycling.
Protect people and equipment first. Then preserve communications and only power the functions required for the minimum viable operation.
The exact technical response varies by business and incident. This sequence keeps the first decisions focused on people, the critical service and a deliberate fallback.
Confirm whether the loss is local or wider. Stop hazardous processes safely, protect people in dark or unsafe areas, and avoid repeated power cycling.
Identify the smallest set of devices and functions that genuinely need backup power. Preserve phone and communications capacity before comfort loads.
Use the documented fallback: alternate site, manual process, delayed work or controlled closure. Tell customers what has changed and when the next update will be.
Pre-agreed thresholds reduce hesitation and stop a degraded situation from drifting without ownership.
Stop or isolate it using the business's approved procedure.
Use the MVO plan; do not treat every socket or device as critical.
Move to the independent communications route and conserve device batteries.
Set a decision point for relocation, reduced service or closure before backup is exhausted.
Restore deliberately; check sensitive equipment and systems before resuming full operation.
Use live provider, emergency-service and regulatory information during a real incident. GPN is the planning layer, not the authority controlling the incident.